US 2/I-89 Southbound On-Ramp Scoping Report
South Burlington, Vermont
June 26, 2009
Submitted by:
Stantec
, South Burlington, Vermont
Cover & Table of Contents
1.0 Introduction
2.0 Existing Conditions
3.0 Project Purpose & Need
4.0 Design Criteria
5.0 Alternatives
6.0 Preferred Alternative
Appendix A. Correspondence / Meeting Minutes
Appendix B. Existing Resources
Appendix C. Traffic Data / Analysis
Appendix D. Opinion of Costs