Municipality Street Activity Start_Date End_Date
BOLTON Route 2 between Lathem Mobile Home Sales in Bolton to Little River Road in Waterbury Bolton-Waterbury Route 2 reconstruction project

Activity: One lane travel and traffic delays.

Reason: On Saturday, August 16 and the week of August 18, crews will be paving Route 2 in Bolton between Latham Trailer Sales and the east end of Bolton Flats. There will be work on guardrails between Waterbury and Bolton Flats on Saturday, and ditching and guardrail operations between Waterbury and the east end of Bolton Flats during the week. Paving is weather dependent. There will be lane closures with alternating one way travel and traffic control will be present. Motorists should expect traffic delays.

2014-04-21 2014-09-01

Municipality Street Activity Start_Date End_Date
BURLINGTON Appletree Point Road, Balsam Street, Farrington Parkway, Vest Haven Drive, Wildwood Street paving program

Activity: One lane travel, traffic delays

Reason: Road construction on the following streets will be completed by the end of August:
Appletree Point Road, Balsam Street, Farrington Parkway and Wildwood Drive and Leddy Park. One way travel will be maintained.

2014-08-07 2014-08-31

Municipality Street Activity Start_Date End_Date
BURLINGTON Mill Street, Thibault Parkway, Fletcher Place, Case Parkway, University Terrace, Juni Street paving program

Activity: One lane travel, traffic delays

Reason: Road construction on the following streets will be completed by the end of September: Mill Street, Thibault Parkway, Fletcher Place, Case Parkway, University Terrace, Juniper Terrace, Summit Ridge, Edgewood Lane, Center Street, and North Champlain Street.

2014-08-12 2014-09-30

Municipality Street Activity Start_Date End_Date
BURLINGTON Hyde Street Hyde Street traffic calming

Activity: Road closure, traffic detour

Reason: Hyde Street is CLOSED at the intersection of North Willard Street for work on traffic calming measures through August 22. Traffic will be detoured.

2014-08-13 2014-08-22

Municipality Street Activity Start_Date End_Date
COUNTYWIDE Countywide Work on Interstate and State Roads

Activity: 

Reason: Motorists should be alert for mowing and street sweeping operations on the interstate and state roads.

2014-04-14 2014-11-01

Municipality Street Activity Start_Date End_Date
ESSEX Route 128 from intersection of Route 15 in Essex 5.7 miles into Westford Essex-Westford Route 128 Repaving

Activity: Lane closures

Reason: Work repaving VT Route 128 from the intersection of Route 15 in Essex extending north on Route 128 for 5.7 miles into Westford will cause one lane travel in areas and reduced speed limits. During the week, there will be general cleanup activities and work on driveway tie-ins and shoulders throughout the project limits. On Tuesday, there will be bridge joint work on the two bridges at the southern end of the project approximately mile north of Route 15. Traffic control will be present and motorists are asked to use extreme caution. This project is anticipated to be completed by the end of August.

2014-06-25 2014-08-31

Municipality Street Activity Start_Date End_Date
INTERSTATE 189 189 westbound 189 westbound on ramp work

Activity: Traffic delays

Reason: Work on I-189 near the westbound on ramps will cause delays during the week from 8:00 a.m. to 3:00 p.m. Motorists should use extreme caution while driving through the work zone.

2014-08-18 2014-08-22

Municipality Street Activity Start_Date End_Date
INTERSTATE 89 Interstate 89 between Richmond and Colchester Richmond to Colchester Repaving Project

Activity: Lane closures, traffic delays, speed limit reduction

Reason: Night time work on I-89 between Richmond and Colchester this week will be Sunday through Friday from 7:00 p.m. until 6:00 a.m. On Sunday through Thursday, there will be continued bridge joint work on the northbound bridges from the two bridges south of Exit 13 to Exit 16. On Sunday through Wednesday, there will be milling at the Exit 16 northbound and southbound ramps along with the southbound ramps from Exit 15 through Exit 16 with paving, weather permitting, in these areas on Thursday and Friday. Motorists should expect lane closures and traffic delays. The speed limit is reduced, and fines are doubled for speeding within the construction zone. Motorists should use extreme caution while driving through the construction areas. This project is expected to be completed at the end of August.

2014-04-15 2014-08-31

Municipality Street Activity Start_Date End_Date
INTERSTATE 89 Interstate 89 Milton Bridges over Lamoille River Project

Activity: Lane and shoulder closures causing traffic delays

Reason: On Saturday, August 16 from 6:00 a.m. to 10:00 p.m., the northbound passing lane will be closed for the installation of a concrete barrier wall along the northbound median. On Monday, a rolling roadblock will be performed throughout the work zone to facilitate the mobilization of cranes and girders. The rolling roadblock will significantly slow down but not completely stop traffic for short durations. During the week, lane closures in both directions may cause traffic delays. Northbound lane closures are from 6:00 a.m. until 2:00 p.m., and southbound lane closures are from 10:00 a.m. until 10:00 p.m. The northbound and southbound shoulders at the Bridge are closed. Motorists should reduce speed and use extreme caution while driving through the construction zone.

2014-01-01 2015-12-31

Municipality Street Activity Start_Date End_Date
JERICHO Hanley Lane Hanley Lane culvert replacement

Activity: Lane closure, minor delays

Reason: Culvert replacement on Hanley Lane will reduce travel to one lane through August 21. Motorists should expect minor delays.

2014-07-21 2014-08-21

Municipality Street Activity Start_Date End_Date
RICHMOND Route 2 Richmond Park and Ride

Activity: Minor traffic delays

Reason: There will be signal work at the Park and Ride intersection on Route 2 during the week. Traffic control will be present.

2014-01-01 2014-08-31

Municipality Street Activity Start_Date End_Date
SOUTH BURLINGTON Route 2 between East Avenue and the I-89 ramps by the Sheraton Route 2 Realignment

Activity: Sidewalk and lane closures

Reason: Construction on the realignment of US Route 2 between East Avenue and the ramps for I-89 by the Sheraton Hotel continues on the north side of US Route 2 by the Sheraton Hotel and UVM property. Work will begin transitioning to the road median, and there will be various lane closures between 7:00 p.m. and 6:00 a.m. Tuesday through Thursday. Regular work hours are Monday through Friday from 6:00 a.m. until 5:00 p.m. with no lane closures expected during peak hours. Traffic flow will continue in both directions at all times. The sidewalk on the north side of Route 2 is closed from the Holiday Inn to East Avenue and pedestrian traffic is detoured. The bus stop remains open on the north side of Route 2 by the Sheraton. This project is expected to be completed July 31, 2015.

2014-06-03 2015-07-31

Municipality Street Activity Start_Date End_Date
WESTFORD Route 128 from intersection of Route 15 in Essex 5.7 miles into Westford Essex-Westford Route 128 paving

Activity: Lane closures

Reason: Work repaving VT Route 128 from the intersection of Route 15 in Essex extending north on Route 128 for 5.7 miles into Westford will cause one lane travel in areas and reduced speed limits. During the week, there will be general cleanup activities and work on driveway tie-ins and shoulders throughout the project limits. On Tuesday, there will be bridge joint work on the two bridges at the southern end of the project approximately mile north of Route 15. Traffic control will be present and motorists are asked to use extreme caution. This project is anticipated to be completed by the end of August.

2014-06-26 2014-08-31

Municipality Street Activity Start_Date End_Date
WILLISTON Route 2 Route 2 Maple Tree Place Waterline work

Activity: One lane travel, traffic delays

Reason: On Sunday and Monday, August 17 and 18 between 9:00 p.m. and 6:30 a.m., traffic will be reduced to one lane on Route 2 by Maple Tree Place to allow for work on the waterline. Traffic control will be present, but motorists are advised to use alternate routes.

2014-08-17 2014-08-18

For current highway conditions in Vermont, please visit the Vermont Travel Information Service.

For additional information, or to subscribe to Traffic Alert, please contact Kathy Finnie at (802) 734-9688.

© 2011 CCRPC Chittenden County Regional Planning Commission