Williston Road Complete Streets Study

The major goal of the Williston Road study is to explore in detail the possibility of implementing a Complete Street concept for Williston Road (US 2) between Dorset Street and Kennedy Drive in South Burlington. This includes reducing the number of vehicle travel lanes from four to three (one lane in each direction with a center lane that accommodates left turns) and adding designated bike lanes within the existing roadway width (curb to curb). Complete streets are designed to enable the safe and efficient travel of pedestrians, bicyclists, motorists and transit riders of all ages and abilities.

A Steering Committee was formed to oversee the study with representation from South Burlington City Council, Planning Commission, Rec Path Committee, Department of Public Works, Business Community, CCRPC and Consultant staff.

 

SEE BELOW FOR MORE INFORMATION ON:

STUDY AREA »
DOCUMENTS »
CONTACT »


Study Area

willistonrd_projectarea_201201_fig1

BACK TO TOP ⇑


Documents

BACK TO TOP ⇑


Contact

For more information, please contact Eleni Churchill, CCRPC Transportation Program Manager, at (802) 846-4490 x *11.

BACK TO TOP ⇑