Bolton Valley Access Road Scoping Study
Latest News
Local Concerns Public Meeting: November 5, 2026, 5:30-7:00pm
Join the project team on November 5 for an open house, followed by a presentation and Q&A. | View the public meeting flyer » | View the story map for more project information »
Project Survey Available
This survey intends to capture how the current conditions of the roadway impact community and visitor use. Please complete this survey to help inform our project focus areas, purpose, and needs.
In collaboration with CCRPC, Bolton Valley Resort, and VHB, the Town of Bolton is seeking to study how to improve the Bolton Valley Access Road. The access road is the most traveled road in the Town of Bolton and serves as a key connector between US Route 2, several residences, and the Bolton Valley Resort, which is enjoyed year-round by local Vermonters and visitors alike. This study has two focus areas:
- The pedestrian and bicyclist access will be studied between Bear Run Road and the Resort.
- The roadway resilience and drainage elements will be investigated from the “S Curve” (or Joiner Brook crossing, just south of Timberline) south to US Route 2.
When complete, the study will outline a series of prioritized recommendations for drainage and roadway resilience projects and identify a preferred alternative for a new pedestrian and bicyclist connection between Bear Run Road and the Resort.
SEE BELOW FOR MORE INFORMATION ON:
PUBLIC PARTICIPATION »
DOCUMENTS »
CONTACT »
PUBLIC PARTICIPATION
All meetings and public participation opportunities will be listed here and on the project story map when scheduled. The public involvement process will be informed and guided by the CCRPC’s Public Participation Plan.
PUBLIC MEETINGS
Local Concerns Public Meeting: November 5, 2026, 5:30-7:00pm – Timberline Lodge, 3220 Bolton Valley Access Rd., Richmond VT 05477
Join the project team on November 5 for an open house, followed by a presentation and Q&A. | View the public meeting flyer » | View the story map for more project information »
PROJECT SURVEY
This survey intends to capture how the current conditions of the roadway impact community and visitor use. Please complete this survey to help inform our project focus areas, purpose, and needs. | Take the survey »
DOCUMENTS
CONTACT
For more information, please contact Sai Sarepalli, CCRPC Transportation Planning Engineer, at (802) 861-0134.