Checkerberry Sidewalk Scoping Study

latest news

Final Report Available: Following final feedback from the Town of Milton Selectboard, Department of Public Works, and VTrans District 5, Alternative 3 has been recommended as the preferred alternative. Learn about all the proposed alternatives in the project’s final report. | View the Final Report »

CCRPC worked with the Town of Milton and consultant Hoyle Tanner to facilitate the development of a missing +-700’ section of sidewalk along Route 7 and West Milton Road from Nancy Drive to Field Ridge Drive. This missing section of sidewalk is an important connection between the Checkerberry and Downtown areas of Milton. The project consults the community to develop and select preferred designs for the sidewalks.

SEE BELOW FOR MORE INFORMATION ON:

STUDY AREA »
PUBLIC PARTICIPATION »
DOCUMENTS »
CONTACT »


STUDY AREA

Click the image to enlarge, or view this PDF.


public participation

All meetings and public participation opportunities are listed here. The public involvement process will be informed and guided by the CCRPC’s Public Participation Plan.

alternatives presentation Meeting: Monday, JULY 7, 2025

July 7, 2025 at the Milton Selectboard’s regularly scheduled meeting | Meeting Presentation » | Meeting Recording »

Local Concerns Meeting: Monday, March 24, 2025, 6-7:30pm

BACK TO TOP ⇑


STUDY DOCUMENTS

BACK TO TOP ⇑


contact

For more information, please contact Eliana Fox, CCRPC Transportation Planner: (802) 846-4490 (ext. 136).

BACK TO TOP ⇑