Checkerberry Sidewalk Scoping Study
latest news
CCRPC worked with the Town of Milton and consultant Hoyle Tanner to facilitate the development of a missing +-700’ section of sidewalk along Route 7 and West Milton Road from Nancy Drive to Field Ridge Drive. This missing section of sidewalk is an important connection between the Checkerberry and Downtown areas of Milton. The project consults the community to develop and select preferred designs for the sidewalks.
SEE BELOW FOR MORE INFORMATION ON:
STUDY AREA »
PUBLIC PARTICIPATION »
DOCUMENTS »
CONTACT »
STUDY AREA
Click the image to enlarge, or view this PDF.
public participation
All meetings and public participation opportunities are listed here. The public involvement process will be informed and guided by the CCRPC’s Public Participation Plan.
alternatives presentation Meeting: Monday, JULY 7, 2025
Local Concerns Meeting: Monday, March 24, 2025, 6-7:30pm
STUDY DOCUMENTS
contact
For more information, please contact Eliana Fox, CCRPC Transportation Planner: (802) 846-4490 (ext. 136).