Hinesburg Route 116 Crosswalk Scoping Study

This study follows up on the 2014 Vermont Route 116 Corridor Study recommendations to evaluate design options and provide cost estimates for improvements to six crosswalks in Hinesburg Village. The study will be done in two phase with Phase 1 to be completed in 2023 and Phase 2 to be completed in 2024.

SEE BELOW FOR MORE INFORMATION ON:

PHASES 1 AND 2 »
STUDY AREA »
CONTACT »


PHASES 1 AND 2

Phase 1 Crosswalks

  1. Mid-block near United Church (10580 Route 116)
  2. Mid-block near Hinesburg Community School (10888 Route 116)
  3. Buck Hill Road intersection

Phase 1 report »

Phase 2 Crosswalks

  1. Commerce Street Intersection
  2. Mechanicsville Road intersection
  3. Charlotte Road intersection
  4. Silver Street intersection

STUDY AREA

Click image to enlarge.

A map of the Route 116 Corridor Study project area that shows existing sidewalks, shared use paths, planned sidewalks or paths, and pedestrian destinations.

 


CONTACT

For more information, please contact Christine Forde, CCRPC Senior Transportation Planner: (802) 846-4490 x113