Intervale Road Pedestrian and Bicycle Access Feasibility Study

The CCRPC, City of Burlington and Intervale Center, along with consultant VHB, partnered on a study to identify walk/bike improvements in this corridor. See study area aerial photo below. The corridor is increasingly busy with a mix of autos, farm vehicles, large trucks, and pedestrians and cyclists. The study analyzed existing conditions, considered future developments and made recommendations on ways to improve safety for all travelers. The Final Report (below) was released in November 2018.

SEE BELOW FOR MORE INFORMATION ON:

STUDY AREA »
SCHEDULE »
PUBLIC PARTICIPATION »
PROJECT TEAM »
DOCUMENTS »
CONTACT »


Study Area

Intervale Study Area
BACK TO TOP ⇑


Schedule

• Project Kick-off: October 2017
• Topographic Survey: October
• Existing Conditions Assessment: November
• Local Concerns Meeting: November / December
• Alternatives Assessment: January – March 2018
• Alternatives Presentation Meeting: April
• Preferred Alternatives Selection: May
• Draft and Final Scoping Report: June 2018
BACK TO TOP ⇑


Public Participation

BACK TO TOP ⇑


Project Team

BACK TO TOP ⇑


Documents

BACK TO TOP ⇑


Contact

For more information, please contact Bryan Davis, Senior Transportation Planner, at (802) 861-0129.
BACK TO TOP ⇑