North Williston Road Scoping Study
As the only bridge over the Winooski River between Route 2A and US 2 at Exit 11, North Williston Road is a valuable crossing point over the Winooski River. With the Circumferential Highway discontinued, traffic volumes along the road are expected to grow and further strain the roadway. The crossing is also critical to bicyclists and pedestrians, providing one of few river crossings off the state highway system. The goal of this project is to identify the appropriate roadway cross sections, drainage and stormwater enhancements, and safety improvements to accommodate the increased demands associated with nearby land development, growth in commuter traffic, demands for growing bicycle and pedestrian traffic, and changing hydraulic conditions.
SEE BELOW FOR MORE INFORMATION ON:
STUDY AREA »
PUBLIC PARTICIPATION »
DOCUMENTS »
CONTACT »
STUDY AREA
PUBLIC PARTICIPATION
Preferred Alternatives Meeting: May 15, 2018
- DPW Background »
- DPW Memo »
- Citizen Petition »
- Staff Map 1 » | Staff Map 2 »
- All Way Stop Warrant Analysis »
Draft Final Alternatives Meeting: February 20, 2018
Draft Alternatives Meeting: December 19, 2017
Local Concerns Meeting: May 2, 2017
DOCUMENTS
- Scope of Work »
- Existing Conditions Report »
- Alternatives Report »
- Final All Way Stop Warrant Analysis »
- Final Report »
CONTACT
For more information, please contact Jason Charest, CCRPC Senior Transportation Planning Engineer, at 802-846-4490 x *32.